How to set a baseline before an AI build.

A baseline is the measured state of a process before you change it. Record it first, or the result cannot be proven.

Key points
  • Record four numbers for each process: volume, time per item, cost and error rate.
  • Take them from the system of record, for a period that covers a normal cycle.
  • Write the definitions down and have the process owner and finance sign them.
  • Measure again after the build with the same definitions, the same report and the same period length.

Record four numbers for each process before you change it: volume, time per item, cost and error rate. Take them from the system of record, write the definitions down, and have the process owner and finance sign the page.

Most AI projects skip this, and then cannot prove their result. IBM’s 2025 CEO study found that 25% of AI initiatives delivered the expected return. A common cause is that nobody measured the process before the change. A baseline takes a few days.

The four numbers

Record these for each process you plan to change.

  1. Volume. How many items each week or month: tickets, leads, quotes, invoices, orders.
  2. Time per item. Handling time, and elapsed time from start to finish. They are different numbers.
  3. Cost. The people, contractors, overtime and outside fees that the process uses.
  4. Error rate. Rework, corrections, credits or duplicate payments.

If the process affects revenue, add one revenue number, such as lead-to-meeting rate, quote win rate or renewal rate.

Where to get them

Take each number from the system of record: the support desk for tickets, the CRM for leads and quotes, the ERP for orders and invoices. Save the report and its filters. You will run the same report after the build.

If no system has the number, sample the work. Time a fixed number of items for one or two weeks. Write down how you sampled.

How long to measure

Cover a normal cycle of the process.

Process rhythm Example Baseline period
Daily Tickets, leads, orders A few weeks of system data
Weekly Payment runs, schedules Several weeks
Monthly Close, reporting Two or three cycles

Avoid a period with a known one-off event, such as a system migration or a peak season. If you must use one, compare it with the same period later.

Write it down and sign it

Put the baseline on one page.

  • The process and its start and end points.
  • Each number, its definition, its source report and the period.
  • The cost figures, agreed with finance.
  • The names of the process owner and the finance lead, and the date.

This page settles later arguments. Without it, each side remembers a different starting point.

Turn the baseline into a business case

With the four numbers you can size the job. Use the AI ROI Calculator for payback, and the department calculators for detail: the Customer Service Cost Calculator, the Speed to Lead Calculator or the Month-End Close Calculator.

Split the result into hard savings, revenue gained at contribution margin and hours saved. The first two make the headline. Hours go beside it. See how to measure the profit from AI.

Measure again the same way

After the build, run the same report with the same filters for the same length of time. Change nothing in the definitions. If the process itself changed, note what changed and when. Then report the difference as run-rate or realized, and say which.

Common questions

What is a baseline in an AI project?

It is the measured state of a process before the change: how much work there is, how long each item takes, what it costs and how often it goes wrong. Each later result is compared with it.

How long should the baseline period be?

Long enough to cover a normal cycle. For daily work such as tickets or leads, a few weeks of system data is usually enough. For monthly work such as the close, use two or three cycles.

What if we have no system data?

Sample the work. Time a set number of items for one or two weeks and record the method. A sampled baseline with a written method is better than an estimate from memory.

Who should own the baseline?

The process owner records it, and finance agrees to the cost figures. Both sign the same one-page document before the build starts.

Sources

  1. IBM Institute for Business Value, 2025 CEO Study

Worked examples on this page are made up to show the math, unless a source is cited.

Maxwell Kroll
Maxwell Kroll

Founder of Opswell. Before Opswell, Maxwell led commercial diligence on more than 25 acquisition targets and sized cost and revenue value across integrations and operating roles. He works on every engagement himself. About Maxwell ›

New articles by email

Where AI makes and saves money, in plain numbers. One email when a new article is published. Unsubscribe any time.

Next step

Size the work before you build it.

The free Snapshot finds the five jobs AI should take over first, and what each one saves, before you commit to a build.