Skip to main content
Free calculator · for controllers and CFOs

Month-end close calculator: how long your close takes and what it costs

Enter your finance team size, salary and how many working days the close takes. You get what each close costs, a likely range from 2,000 simulated closes, and the tasks that slow it. You also see how many days you save when reconciliations, accruals and commentary are automated.

Sample numbers. The tool opens with a made-up company. Change any input to use your own.

Free calculator · controllers and CFOs
Month-End Close Calculator

Enter team size, salary and days to close. You get what each close costs, how long the slowest chain of hand-offs takes, and how many days automating the prep work saves.

Everyone who owns a task on the close checklist in a typical month: staff accountants, AP and AR leads, the revenue accountant, the controller.

Annual base pay of those people, averaged, from payroll or your HR system. The calculator adds 30% for benefits, payroll tax, and tools (Opswell assumption).

From your close calendar: business days from the last day of the month to final numbers (books locked, pack issued), in a typical recent month. Weekends and holidays excluded.

Total hours everyone spends on close tasks in one month’s close, from time tracking or the hour estimates on your close checklist. The 180 default is an Opswell placeholder. Now 30 hours per person.

On a close day, the hours one person can give to close tasks after meetings, payroll, and day-to-day AP. Ask the team or check last month’s time tracking. It sets how fast each stage moves.

12 on a monthly or 4-4-5 calendar; 13 on a 13-period (4-4-4-4) calendar; 4 if you only close quarterly.

How much of the prep work you automate

Automation level 75% of each task’s automatable share (Opswell assumption). Reviews and sign-offs stay mostly manual in every case.

Your close today
8 daysbusiness days to close
$12Kloaded team cost per close
$148Kcost of closing a year
180team hours per close

180 team hours at $68.61 an hour loaded = $12K a close, $148K across 12 closes.

How you compare · Business days to close
  1. 4.7 d single-entity companies, average (business days). Vena, 2026
  2. 6.2 d all companies, average (business days). Vena, 2026
  3. 8.3 d more than 10 entities, average (business days). Vena, 2026

Lower is better.

One unit on this scale. Every point is business days to complete the close, as survey respondents reported them. Vena does not publish when its count starts; like your input, we read it from the last day of the month. APQC is left off the scale because it counts calendar days from the first trial balance to the consolidated statements, which starts after the subledgers close. Its 5 / 6 / 10 calendar days (top performers, median, bottom performers) are about 3.6 / 4.3 / 7.1 business days (× 5/7), still on that later start. APQC

Where 8 business days sits in Ledge’s 2025 survey (100 teams, vendor survey, small sample)
The slowest chain of hand-offs

Close length is set by the chain of hand-offs, not by total effort. The model runs four stages in order. Each takes its hours ÷ (people who can work it at once × 6.5 hours a day), then waits for its inputs. The waiting is the part of your 8 days that the work does not explain.

Stage, in orderPeople on itTeam hoursDays todayPrep automated
Subledgers, accruals and cut-off6581.50.8
Account reconciliations6370.90.4
Intercompany and consolidation3201.00.6
Commentary, reporting pack and review3653.31.7
Waiting between hand-offs (4 × 0.3 days)1.21.2
Close length, average month1808.04.8

Average month, before month-to-month variability. Rounded to a tenth of a day, so rows may not add exactly.

What automation changes
3.2 days
shorter close in an average month, modelled along the hand-off chain
Work along the chain falls from 6.8 to 3.6 days. The 1.2 days of waiting stay, so the close goes from 8.0 to 4.8 business days.
Hard savings
$0
None claimed. The team stays the same size.
Revenue gained
$0
None claimed.
Hours saved
$49K
712 hours a year (0.4 FTE) at loaded cost. Time back, which counts as cash only when the cost leaves the business.

Team hours per close fall from 180 to 95. Counting 70% of that as usable time gives 712 hours a year. The same people finish sooner and spend the time on review, analysis and an earlier report. It becomes hard savings only if you stop paying for something, such as overtime, a contractor, or a hire you no longer need. This calculator does not assume that, so there is no savings figure and no payback here.

Illustrative range from assumed task variability

Opswell assumption, not a measurement of your close. Each task’s hours vary from month to month by an assumed amount (coefficient of variation 0.25 to 0.55). The model runs the chain 2,000 times with those draws, waiting held fixed, and shows the spread to the nearest half day. Your own bad months may come from somewhere else.

5d7.5d10d12.5dAutomated P50 5dToday P50 8d
Today Prep work automatedWhiskers under the chart run from P10 to P90; the dot is P50.
PercentileTodayPrep automated
P10 (a good month)6.5 days4 days
P50 (a typical month)8 days5 days
P90 (a bad month)9.5 days5.5 days
Where the close time goes

Ranked by days each task adds to the chain. A task worked by fewer people adds more days per hour.

01Flux & variance commentary1.5 d
30 h (17% of team hours) · Commentary, reporting pack and review, 3 people · 16 h automated at this level (green)
02Reporting pack assembly1.1 d
21 h (12% of team hours) · Commentary, reporting pack and review, 3 people · 12 h automated at this level (green)
03Intercompany / consol1.0 d
20 h (11% of team hours) · Intercompany and consolidation, 3 people · 8 h automated at this level (green)
04Account reconciliations0.9 d
37 h (21% of team hours) · Account reconciliations, 6 people · 20 h automated at this level (green)
05Reviews & sign-offs0.7 d
14 h (8% of team hours) · Commentary, reporting pack and review, 3 people · 3 h automated at this level (green)
06Accruals & JE drafts0.6 d
24 h (13% of team hours) · Subledgers, accruals and cut-off, 6 people · 12 h automated at this level (green)
07AP / AR cleanup0.5 d
18 h (10% of team hours) · Subledgers, accruals and cut-off, 6 people · 8 h automated at this level (green)
08Revenue recognition0.4 d
16 h (9% of team hours) · Subledgers, accruals and cut-off, 6 people · 7 h automated at this level (green)
What moves your close length

Each task’s hours 20% lower and 20% higher, waiting held fixed. The bar is the average-month close that results; the line is today’s 8.0 days.

  • Flux & variance commentary7.7–8.3d
  • Reporting pack assembly7.8–8.2d
  • Intercompany / consol7.8–8.2d
  • Account reconciliations7.8–8.2d
  • Reviews & sign-offs7.9–8.1d
  • Accruals & JE drafts7.9–8.1d
Show the math
  • Loaded hourly cost = salary × 1.3 ÷ 1,800 hours. Cost per close = team hours per close × loaded hourly cost. Cost a year = cost per close × closes per year.
  • Task hours: Opswell’s default mix of eight tasks, scaled so they add up to your 180 team hours.
  • Four stages run in order: subledgers, reconciliations, consolidation, then reporting and review. Stage days = stage hours ÷ (people on the stage × close hours per person per day). Subledgers and reconciliations use the whole team; consolidation and reporting and review use half of it, at least one person (Opswell assumptions).
  • Waiting per hand-off = (your 8 days − 6.8 days of stage work) ÷ 4, never below zero = 0.3 days. Close length = stage days + waiting.
  • Automation: each task’s hours fall by its automatable share × the automation level (45% conservative, 75% base, 92% stretch), capped at 95%. Automatable shares run from 25% (reviews and sign-offs) to 80% (reporting pack). Waiting does not change. Days faster = stage days today − stage days automated.
  • Hours back a year = hours removed per close (85) × closes per year × 0.7. Hours saved in dollars = hours back × loaded hourly cost. Hard savings = $0.
  • Range: 2,000 runs, each task drawn from a lognormal with its assumed variability, fixed seed. Illustrative only; it is not measured from your closes.
  • Sensitivity: each task’s hours × 0.8 and × 1.2 in an average month, waiting held fixed.
Compared with the research. Vena’s 2026 average is 6.2 business days: 4.7 for single-entity companies and 8.3 with more than 10 entities. APQC’s median of 6 calendar days is about 4.3 business days, counted from the first trial balance rather than month-end, so it is not a like-for-like target. Your modelled close with the prep work automated is 4.8 business days from month-end. Vena · APQC
Keep this result

Want to know if the close is the best place to start? Compare it with receivables, payables and the rest of the back office in the Opportunity Finder ›

Share it with whoever signs off
Get this as a one-page report

One page with your numbers and the math. We send your email, company, a summary of this result, and where your visit came from to our CRM. Your browser makes the PDF itself. Maxwell may follow up once. We never sell your information. Privacy

Next: check this on your own data

Request a free Snapshot, and your inputs come with the request. After one 45-minute call, we look at your exports and name the five jobs AI should take over first, with what each one saves. You get it in five business days. The Snapshot builds nothing.

Continue to your free Snapshot ›Or book 20 minutes ›

How long should month-end close take?

Most finance teams close in four to eight business days. Vena’s 2026 survey puts the average at 6.2 business days: 4.7 for single-entity companies and 8.3 with more than 10 entities. In Ledge’s smaller survey, half of teams close in five business days or fewer. APQC’s median is 6 calendar days, but it counts from the first trial balance, not from month-end.

How this is calculatedthe formula, a worked example, benchmarks, assumptions and sources · about 8 min read

The month-end close formula

Cost comes straight from your own numbers. Close length follows the slowest chain of hand-offs, not total effort. The defaults are a typical mid-sized finance team and Opswell assumptions, not a benchmark.

Loaded hourly cost
average salary × 1.3 ÷ 1,800 hoursSalary × 1.3 covers benefits, payroll tax, and tools. 1,800 is the paid-hours basis Opswell uses in every engine. Both are Opswell assumptions.
Cost per close
team hours per close × loaded hourly costTeam hours per close come from your time tracking or close checklist.
Cost of closing a year
cost per close × closes per year
Stage work days
stage hours ÷ (people on the stage × close hours per person per day)Four stages in order: subledgers, reconciliations, consolidation, reporting and review. Each starts only when the one before it is done.
Close length
sum of stage work days + waiting between hand-offsWaiting is the part of your stated close that the work does not explain. Automation shortens the work, not the waiting.
Hours back a year
task hours removed per close × closes per year × 0.7Shown as time back. Hard savings are $0 unless you stop paying for something.

How to use this calculator

  1. Count everyone with close tasksUse your close checklist: everyone who owns a task in a typical month. Include staff accountants, AP and AR leads, the revenue accountant, and the controller. Leave out people who only receive the reporting pack.
  2. Enter business days from month-endFrom your close calendar, count business days from the last day of the month to the day the numbers are final. If the pack goes out on business day 7, enter 7.
  3. Enter the team hours one close takesAdd up the hours everyone logs on close tasks in one month’s close, from time tracking or the hour estimates on your checklist. This sets the cost. Do not multiply headcount by days: most people are not on close work all day, every close day.
  4. Set close hours per person per dayOn a close day, how many hours can one person give to close work after meetings, payroll, and day-to-day AP? 6 to 7 is common. This sets how fast each stage moves.
  5. Read the chain, then the rangeThe stage table shows where the days go and how much is waiting. The P10 to P90 range is illustrative: it comes from assumed task variability, not from your own closes.
  6. Pick an automation caseConservative assumes a light first build. Base is what a well-scoped reconciliation and commentary automation usually covers. Stretch assumes most of the prep work runs before the team starts. All three are Opswell assumptions.

Worked example: a six-person team on an eight-day close

A mid-sized finance team, using the calculator’s default inputs and the base automation case (75%).

Worked example inputs
Finance people on the close6
Average base salary$95,000
Business days to close, from month-end8
Team hours per close180
Close hours per person per close day6.5
Closes per year12
  1. Loaded hourly cost: $95,000 × 1.3 ÷ 1,800 = $68.61.
  2. Cost per close: 180 × $68.61 = $12,350. Across 12 closes that is $148,200 a year.
  3. The chain: subledgers 58 hours across 6 people (1.5 days), reconciliations 37 hours across 6 (0.9), consolidation 20 hours across 3 (1.0), reporting and review 65 hours across 3 (3.3). That is 6.8 days of work; the other 1.2 days of the eight are waiting between hand-offs.
  4. With the prep work automated at the base level, the work falls to 3.6 days. The waiting stays, so the close goes from 8.0 to 4.8 business days: 3.2 days faster.
  5. Flux commentary adds the most days (1.5, because three people share 30 hours), then the reporting pack (1.1) and intercompany (1.0). Reconciliations are the biggest task by hours (37, 21%) but add only 0.9 days because the whole team works them.
  6. The illustrative range from assumed task variability: 6.5 to 9.5 days today and 4 to 5.5 days automated (P10 to P90).

About 3.2 days off every close, from 85 team hours removed per close. Counting 70% of that gives 712 hours a year, or 0.4 of a full-time person. At loaded cost that time is worth $48,800 a year as time back, not cash: the same six people finish sooner. Hard savings stay at $0 unless the team stops paying for overtime, a contractor, or a planned hire.

Month-end close benchmarks

Published figures to set your close against. They do not all count the same thing. Vena and Ledge report business days to complete the close. APQC counts calendar days from the first trial balance, a later start than month-end.

Month-end close benchmarks
MeasureFigureWho it describesSource
Monthly consolidation, top performers5 calendar days (about 3.6 business days), from the first trial balanceAPQC Open Standards Benchmarking, about 11,000 organizationsAPQC
Monthly consolidation, median6 calendar days (about 4.3 business days), from the first trial balanceAPQC Open Standards BenchmarkingAPQC
Monthly consolidation, bottom performers10 calendar days (about 7.1 business days), from the first trial balanceAPQC Open Standards BenchmarkingAPQC
Average month-end close6.2 business daysUS finance professionals, vendor surveyVena, 2026
Single entity vs more than 10 entities4.7 vs 8.3 business daysSame Vena surveyVena, 2026
Teams that had to correct “final” numbers78%Same Vena surveyVena, 2026
Share of teams by close length1–3 days 18%; 4–5 days 32%; 6–7 days 23%; over 7 days 27%100 finance professionals, vendor surveyLedge, 2025

APQC measures calendar days, weekends included, from the first trial balance to the consolidated statements. The business-day figures in brackets are calendar days × 5/7, an Opswell conversion. Even converted, APQC is not like-for-like with Vena: its clock starts after the subledgers close, so it leaves out the first days of a close counted from month-end. That is why the calculator’s comparison scale uses Vena only and keeps APQC as a note. Vena does not publish when its count starts; the calculator reads it, like your input, as from the last day of the month. Vena and Ledge are vendor surveys; Ledge’s sample is only 100 people and leans towards SaaS, healthcare, and manufacturing, so read its distribution as a rough shape. Entity count matters more than industry: Vena’s multi-entity companies take almost twice as long as single-entity ones.

Sources: APQC, cycle time to complete monthly consolidated financial statements; Vena, month-end close benchmarks survey; Ledge, month-end close benchmarks for 2025.

What slows a month-end close

Close length is set by the slowest chain of hand-offs, not by total effort. A team can work hard all week and still wait two days for one bank feed, one intercompany confirmation, or one revenue schedule. That is why entity count shows up so strongly in Vena’s numbers.

The calculator models this directly. It runs the close as four stages in order (subledgers, reconciliations, consolidation, then reporting and review), each taking its hours ÷ the people who can work it at once, and treats the rest of your stated close as waiting between hand-offs. A task worked by a few people adds more days per hour than one the whole team shares. In the default mix, flux commentary moves the close most, then the reporting pack and intercompany; reconciliations are the biggest task by hours but are spread across the whole team. If your own bad months come from somewhere else, that task is your bottleneck, whatever the model says.

  • Reconciliations done from scratch in spreadsheets each month, with the same matching repeated by hand.
  • Late inputs: bank statements, payroll files, inventory counts, and accrual estimates from budget holders.
  • Intercompany and consolidation, especially when entities close on different days or in different systems.
  • Variance commentary written after the numbers are final, so review has to happen twice.
  • Corrections after “final”: Vena found 78% of teams have had to fix numbers they had already closed.

Where AI helps the close, and where it doesn’t

Opswell automates the prep work alongside your accountants. It never does the close itself. The accountants own the books, the judgement, and the sign-off; Opswell does not provide bookkeeping, tax, or audit services. What changes is how much is ready when they start.

Reconciliations: matching bank, card, and subledger lines to the general ledger and listing only the breaks. Accrual drafts: proposing recurring and PO-based accruals with the support attached, for an accountant to accept or change. Flux commentary: drafting the first version of variance explanations from the ledger detail, so the reviewer edits rather than writes. Reporting pack: pulling the same tables and charts into the same template every month.

AI does not help with judgement calls (reserves, impairments, revenue on unusual contracts), with reviews and sign-offs, or with auditor requests, which need a person who knows why an entry was made. That is why the model leaves reviews and sign-offs at a 25% automatable share and why even the stretch case keeps people on every task.

Why a faster close is time back, not savings

A three-day faster close does not change payroll on its own. The same people finish earlier and spend the time on analysis, cleaner reconciliations, or a report that reaches the CEO sooner. That time is worth having, but it is not cash.

It turns into hard savings only when the budget goes down: overtime you stop paying at quarter-end, a contractor you don’t renew, or a hire you no longer need as the company grows. The calculator does not assume any of those, so it shows $0 of hard savings, no payback figure, and shows the dollar value of the hours only as time back.

Calendar days, business days, and what to report

Pick one definition and use it every month. Business days from month-end to final numbers is the most common in surveys and the easiest to explain. If you benchmark against APQC, convert first: count the calendar days from your first trial balance to the consolidated statements.

Track your worst month as well as the average. A close that is five days most months and twelve in a bad one is a bigger risk than a steady seven, because the bad month is usually the quarter-end that matters most. The calculator’s P10 to P90 range is illustrative, from assumed task variability; your own close calendar is the real record.

Assumptions and limits

  • Loaded cost = salary × 1.3, over 1,800 paid hours a year, the same basis as Opswell’s other engines.
  • Cost per close uses the team hours per close you enter. The 180-hour default is an Opswell placeholder, not a benchmark.
  • Eight close tasks with a default share of hours: reconciliations 96, flux commentary 78, accruals 62, reporting pack 54, intercompany 52, AP/AR cleanup 48, revenue recognition 42, reviews and sign-offs 36 (out of 468). These are Opswell’s own assumptions, scaled to your team hours, not measured benchmarks.
  • Four stages in order: subledgers (AP/AR, revenue recognition, accruals), reconciliations, consolidation (intercompany), and reporting and review (flux commentary, reporting pack, reviews and sign-offs). The whole team can work the first two; half the team, at least one person, works the last two. Opswell assumptions.
  • Waiting between hand-offs = your stated close minus the stage work days, split evenly over the four stages. Automation does not shorten it. If the work alone is longer than your stated close, the model uses the work and no waiting, and says so.
  • Automatable share per task runs from 25% (reviews and sign-offs) to 80% (reporting pack). The automation level multiplies it: 45% conservative, 75% base, 92% stretch. No task falls by more than 95%.
  • Hours back a year count only 70% of the task hours removed (Opswell assumption: reviewing automated output and switching tasks take some of it).
  • The P10 to P90 range comes from assumed task variability (coefficient of variation 0.25 for reviews to 0.55 for revenue recognition, lognormal, 2,000 runs, fixed seed). It is illustrative, not measured, and is shown to the nearest half day.
  • This is an estimate from your inputs. A free Snapshot sizes the close from your own checklist and time data and replaces the default hour mix with yours.

Terms used on this page

Month-end close
The work to finalise a month’s books: reconciliations, accruals, adjustments, review, and the reporting pack.
Business day
A working weekday. Most close surveys count these; APQC counts calendar days from the first trial balance.
Flux analysis
Explaining material changes in account balances against the prior month, prior year, or budget.
P10 / P50 / P90
The close length beaten in 10%, 50%, and 90% of simulated months, from assumed task variability: an illustrative good, typical, and bad month.
Hand-off
The point where one stage of the close waits for another to finish, such as consolidation waiting on subledgers and reconciliations.
Hours saved
Time back for other work. Not cash until you stop paying for something.

Sources

Common questions

What is a good month-end close time?

Five business days or fewer is a common target for a mid-sized company. Vena’s 2026 average is 6.2 business days (4.7 single-entity). APQC’s top performers finish monthly consolidation in 5 calendar days, about 3.6 business days, but counted from the first trial balance rather than month-end. Multi-entity groups take longer: Vena’s average for more than 10 entities is 8.3 business days.

Does APQC count calendar days or business days?

Calendar days, including weekends, from running the first trial balance to completing the consolidated statements. Vena and Ledge report business days. Multiplying by 5/7 converts the unit (APQC’s median of 6 is about 4.3 business days), but not the start: APQC’s clock starts after the subledgers close, so it is still shorter than the same close counted from month-end.

How do I calculate the cost of the month-end close?

Take the total hours your team spends on one close, from time tracking or the hour estimates on your close checklist. Multiply by loaded hourly cost (salary × 1.3 ÷ 1,800) for cost per close, and by closes per year for the annual figure. Do not use people × days to close × hours a day: few people spend every close day on close work, so that overstates the cost.

Why does the calculator show a range instead of one number?

Because no two closes take the same time. The headline figures are an average month. The range varies each task’s hours 2,000 times by an assumed amount and reports a good month (P10), a typical month (P50), and a bad month (P90). The variability is an Opswell assumption, so read the range as illustrative, not as a measurement of your close.

Will automating the close reduce headcount?

Not by itself, and this calculator does not assume it. A faster close frees hours. It becomes a cost saving only if you stop paying for overtime or contractors, or avoid a hire as you grow. That is why the dollars show as time back and hard savings show as $0.

Which close tasks can AI do?

The prep work: transaction matching for reconciliations, first-draft accruals with support, first-draft flux commentary, and assembling the reporting pack. It does not make judgement calls, approve entries, sign off the close, or answer auditors. Accountants keep all of that.

Does Opswell do our close or bookkeeping?

No. Opswell builds automations that prepare the work for your accountants. It does not provide bookkeeping, close, tax, or audit services, and your team keeps ownership of the books and every sign-off.

How many days does a multi-entity close add?

In Vena’s 2026 survey, companies with more than 10 entities averaged 8.3 business days against 4.7 for single-entity companies, a gap of 3.6 days. Intercompany matching and consolidation are usually where that time goes.

Reviewed November 22, 2026 by Maxwell Kroll, founder of Opswell. The math runs in your browser. A Python copy of the same engine runs on our server, and we test that both give the same answer on every release.

Next step

Size your close from your own task list

In a free Snapshot, we size your close from your checklist and time data, plus four other jobs. One 45-minute call, results in five business days.