Skip to main content
Operations and supply chain

Review reorder suggestions before a planner sees them

The ERP suggests what to buy. Planners do not trust it, so they check each line by hand. AI does the first check.

Hard savingsis where most of the saving comes from
6–8 weeksto first results, based on a similar build
5 stepsand a person checks the result

How the work is done today

Reorder points and lead times in the ERP are often old. A one-time large order or a promotion distorts the history. The system then suggests too much or too little.

Planners know this, so they review many lines one at a time in spreadsheets. Slow items get too much attention and true exceptions are missed.

Works with
ERP inventory and purchasingWarehouse management systemPlanning spreadsheets

What Claude does, step by step

  1. Take the suggestionsThe reorder report, stock on hand, open orders, and sales history are pulled from the ERP.
  2. Check each lineClaude checks for one-time demand, a changed lead time, a substitute item, or excess stock at another site.
  3. Explain the exceptionsEach unusual line gets a short reason in words, with the numbers behind it.
  4. Propose setting changesReorder points and lead times that no longer match recent history are listed for correction.
  5. Prepare the buy listNormal lines are grouped by supplier. Exceptions go to the top of the planner’s queue.

What stays with a person: The planner approves every purchase and every change to a planning setting. The AI does not place orders.

What it saves

Hard savingsHours savedRevenue gained

Lower excess stock reduces carrying cost and write-offs, which are hard savings when measured. Fewer stockouts add revenue. Planner time saved counts as hours, not cash.

Hours saved count as cash only when a cost goes away.Which AI dollars are real?

Need a dollar figure now? The Snapshot puts one on this job for your company. These operations and supply chain jobs have a formula and a calculator today: Order-to-cash exception handling.

How you will know it worked

Excess and obsolete stock
Stock value above your own cover target, by month.
Stockouts on stocked items
Lines short at order time, from the ERP.
Planner time per review cycle
A time sample before and after.

The data we need to start

  • Item master with reorder settings and lead times
  • Sales and usage history
  • Stock on hand and open POs by site

A sample is enough to plan the build. Sensitive data stays in your own systems. Security and data handling

How long the build takes

Plan on 6 to 8 weeks to first results. That is the time our model gives forpricing and discount discipline, the closest build we have priced.

This is one of the longer builds. It needs clean item history and a planner’s time to agree the rules.

This is a guide, not a quote. The Snapshot gives a time for your own systems.

What can go wrong, and what we do about it

Poor master data

Wrong units of measure or lead times give wrong advice. Check a sample of items before the build.

It is not a forecasting system

The AI reviews what your ERP suggests. It does not replace a demand planning tool.

Supply shocks

History does not show a supplier failure or a new customer. Planners must add what they know.

Industries where replenishment review fits best

Each industry page lists the other jobs that fit it.

FAQ

Common questions

What is replenishment review worth in dollars?

It depends on how much of this work you do, so we work it out in the free Snapshot from your own records. Most of the saving is hard savings. Lower excess stock reduces carrying cost and write-offs, which are hard savings when measured. Fewer stockouts add revenue. Planner time saved counts as hours, not cash.

What does a person still do?

The planner approves every purchase and every change to a planning setting. The AI does not place orders.

What data do we need to start?

Item master with reorder settings and lead times. Sales and usage history. Stock on hand and open POs by site. A sample is enough to start.

How long does it take to build?

Usually 6 to 8 weeks to first results. That is the time for pricing and discount discipline, the closest build we have priced. This is one of the longer builds. It needs clean item history and a planner’s time to agree the rules.

Do we have to buy new software?

No. Opswell builds it in your own Claude workspace, connected to the software you use today. You own the prompts, the connections and the written instructions.

Next step

Find out what replenishment review is worth to you

In a free Snapshot, we find the five jobs AI should take over first in your business, and what each one saves. It takes one 45-minute call. You get it in five business days.