Month-End Close Calculator

Free calculator · controllers and CFOs
Month-End Close Calculator

Enter team size, salary and days to close. You get what each close costs, how long the slowest chain of hand-offs takes, and how many days automating the prep work saves.

Everyone who owns a task on the close checklist in a typical month: staff accountants, AP and AR leads, the revenue accountant, the controller.

Annual base pay of those people, averaged, from payroll or your HR system. The calculator adds 30% for benefits, payroll tax, and tools (Opswell assumption).

From your close calendar: business days from the last day of the month to final numbers (books locked, pack issued), in a typical recent month. Weekends and holidays excluded.

Total hours everyone spends on close tasks in one month’s close, from time tracking or the hour estimates on your close checklist. The 180 default is an Opswell placeholder. Now 30 hours per person.

On a close day, the hours one person can give to close tasks after meetings, payroll, and day-to-day AP. Ask the team or check last month’s time tracking. It sets how fast each stage moves.

12 on a monthly or 4-4-5 calendar; 13 on a 13-period (4-4-4-4) calendar; 4 if you only close quarterly.

How much of the prep work you automate

Automation level 75% of each task’s automatable share (Opswell assumption). Reviews and sign-offs stay mostly manual in every case.

Your close today
8 daysbusiness days to close
$12Kloaded team cost per close
$148Kcost of closing a year
180team hours per close

180 team hours at $68.61 an hour loaded = $12K a close, $148K across 12 closes.

How you compare · Business days to close
  1. 4.7 d single-entity companies, average (business days). Vena, 2026
  2. 6.2 d all companies, average (business days). Vena, 2026
  3. 8.3 d more than 10 entities, average (business days). Vena, 2026

Lower is better.

One unit on this scale. Every point is business days to complete the close, as survey respondents reported them. Vena does not publish when its count starts; like your input, we read it from the last day of the month. APQC is left off the scale because it counts calendar days from the first trial balance to the consolidated statements, which starts after the subledgers close. Its 5 / 6 / 10 calendar days (top performers, median, bottom performers) are about 3.6 / 4.3 / 7.1 business days (× 5/7), still on that later start. APQC

Where 8 business days sits in Ledge’s 2025 survey (100 teams, vendor survey, small sample)
The slowest chain of hand-offs

Close length is set by the chain of hand-offs, not by total effort. The model runs four stages in order. Each takes its hours ÷ (people who can work it at once × 6.5 hours a day), then waits for its inputs. The waiting is the part of your 8 days that the work does not explain.

Stage, in orderPeople on itTeam hoursDays todayPrep automated
Subledgers, accruals and cut-off6581.50.8
Account reconciliations6370.90.4
Intercompany and consolidation3201.00.6
Commentary, reporting pack and review3653.31.7
Waiting between hand-offs (4 × 0.3 days)1.21.2
Close length, average month1808.04.8

Average month, before month-to-month variability. Rounded to a tenth of a day, so rows may not add exactly.

What automation changes
3.2 days
shorter close in an average month, modelled along the hand-off chain
Work along the chain falls from 6.8 to 3.6 days. The 1.2 days of waiting stay, so the close goes from 8.0 to 4.8 business days.
Hard savings
$0
None claimed. The team stays the same size.
Revenue gained
$0
None claimed.
Hours saved
$49K
712 hours a year (0.4 FTE) at loaded cost. Time back, which counts as cash only when the cost leaves the business.

Team hours per close fall from 180 to 95. Counting 70% of that as usable time gives 712 hours a year. The same people finish sooner and spend the time on review, analysis and an earlier report. It becomes hard savings only if you stop paying for something, such as overtime, a contractor, or a hire you no longer need. This calculator does not assume that, so there is no savings figure and no payback here.

Illustrative range from assumed task variability

Opswell assumption, not a measurement of your close. Each task’s hours vary from month to month by an assumed amount (coefficient of variation 0.25 to 0.55). The model runs the chain 2,000 times with those draws, waiting held fixed, and shows the spread to the nearest half day. Your own bad months may come from somewhere else.

5d7.5d10d12.5dAutomated P50 5dToday P50 8d
Today Prep work automatedWhiskers under the chart run from P10 to P90; the dot is P50.
PercentileTodayPrep automated
P10 (a good month)6.5 days4 days
P50 (a typical month)8 days5 days
P90 (a bad month)9.5 days5.5 days
Where the close time goes

Ranked by days each task adds to the chain. A task worked by fewer people adds more days per hour.

01Flux & variance commentary1.5 d
30 h (17% of team hours) · Commentary, reporting pack and review, 3 people · 16 h automated at this level (green)
02Reporting pack assembly1.1 d
21 h (12% of team hours) · Commentary, reporting pack and review, 3 people · 12 h automated at this level (green)
03Intercompany / consol1.0 d
20 h (11% of team hours) · Intercompany and consolidation, 3 people · 8 h automated at this level (green)
04Account reconciliations0.9 d
37 h (21% of team hours) · Account reconciliations, 6 people · 20 h automated at this level (green)
05Reviews & sign-offs0.7 d
14 h (8% of team hours) · Commentary, reporting pack and review, 3 people · 3 h automated at this level (green)
06Accruals & JE drafts0.6 d
24 h (13% of team hours) · Subledgers, accruals and cut-off, 6 people · 12 h automated at this level (green)
07AP / AR cleanup0.5 d
18 h (10% of team hours) · Subledgers, accruals and cut-off, 6 people · 8 h automated at this level (green)
08Revenue recognition0.4 d
16 h (9% of team hours) · Subledgers, accruals and cut-off, 6 people · 7 h automated at this level (green)
What moves your close length

Each task’s hours 20% lower and 20% higher, waiting held fixed. The bar is the average-month close that results; the line is today’s 8.0 days.

  • Flux & variance commentary7.7–8.3d
  • Reporting pack assembly7.8–8.2d
  • Intercompany / consol7.8–8.2d
  • Account reconciliations7.8–8.2d
  • Reviews & sign-offs7.9–8.1d
  • Accruals & JE drafts7.9–8.1d
Show the math
  • Loaded hourly cost = salary × 1.3 ÷ 1,800 hours. Cost per close = team hours per close × loaded hourly cost. Cost a year = cost per close × closes per year.
  • Task hours: Opswell’s default mix of eight tasks, scaled so they add up to your 180 team hours.
  • Four stages run in order: subledgers, reconciliations, consolidation, then reporting and review. Stage days = stage hours ÷ (people on the stage × close hours per person per day). Subledgers and reconciliations use the whole team; consolidation and reporting and review use half of it, at least one person (Opswell assumptions).
  • Waiting per hand-off = (your 8 days − 6.8 days of stage work) ÷ 4, never below zero = 0.3 days. Close length = stage days + waiting.
  • Automation: each task’s hours fall by its automatable share × the automation level (45% conservative, 75% base, 92% stretch), capped at 95%. Automatable shares run from 25% (reviews and sign-offs) to 80% (reporting pack). Waiting does not change. Days faster = stage days today − stage days automated.
  • Hours back a year = hours removed per close (85) × closes per year × 0.7. Hours saved in dollars = hours back × loaded hourly cost. Hard savings = $0.
  • Range: 2,000 runs, each task drawn from a lognormal with its assumed variability, fixed seed. Illustrative only; it is not measured from your closes.
  • Sensitivity: each task’s hours × 0.8 and × 1.2 in an average month, waiting held fixed.
Compared with the research. Vena’s 2026 average is 6.2 business days: 4.7 for single-entity companies and 8.3 with more than 10 entities. APQC’s median of 6 calendar days is about 4.3 business days, counted from the first trial balance rather than month-end, so it is not a like-for-like target. Your modelled close with the prep work automated is 4.8 business days from month-end. Vena · APQC
Keep this result

Want to know if the close is the best place to start? Compare it with receivables, payables and the rest of the back office in the Opportunity Finder ›

Share it with whoever signs off
Get this as a one-page report

One page with your numbers and the math. We send your email, company, a summary of this result, and where your visit came from to our CRM. Your browser makes the PDF itself. Maxwell may follow up once. We never sell your information. Privacy

Next: check this on your own data

Request a free Snapshot, and your inputs come with the request. After one 45-minute call, we look at your exports and name the five jobs AI should take over first, with what each one saves. You get it in five business days. The Snapshot builds nothing.

Continue to your free Snapshot ›Or book 20 minutes ›

Month-End Close Calculator · free from Opswell